The performance requirements of the ncc if a fire brigade booster assembly is incorporated in the design.
Fire hydrant booster assembly requirements.
Hazardous chemicals manifest pdf fire brigade booster connection with inlet insert pdf fire hydrant concessions for existing buildings pdf.
Fire hydrants for minor residential development pdf fire safety in waste facilitites pdf guidelines for bulk storage of rubber tyres pdf impulse fans in car parks pdf technical information sheets.
Fire brigade booster assembly installed external attack hydrant pressure and flow requirements apply additional pressure and flow capacity when boosted internal attack hydrant pressure and flow different requirements as 2419 1 public comment draft.
The booster assembly provides a point of attachment for the fire brigade to provide additional water to a fire hydrant system in the event of an emergency.
Booster and hydrant assemblies consist of arrangements of valves pipe work to suit specific site fire protection needs.
Fire hydrant system commissioning tests do not satisfy the test requirements for fire brigade booster connection compliance as required by as 2419 3 2012.
Determine if road closure or traffic diversion is required.
Flow requirements qfes expect that the flow and pressure of the street hydrant is tested to ensure compliance with australian standard as 2419 1 2005 table 2 1 and shall be capable of discharging no less than.
The location of the fire brigade booster should be chosen to ensure that it is readily accessible and provide protection to fire fighters.
03 9764 0020 for more information about any fire protection equipment.
7 6 when the fire brigade booster connection is installed the completed fire hydrant system is to be tested and commissioned in accordance with section 10 of as 2419 1 2005.
Ensure adequate parking for fire appliances.
Fire brigade test pressure is 1700kpa all booster units can be supplied as individual components or fully part assembled.
The site needs to have appropriate parking space available for the fire appliances to park whilst within reach of the fire hydrant booster system.
Please nominate connections lh or rh entry either butterfly or gate valves required to suit relevant authority requirements.
Assess the site for the safety and logistical requirements to carry out the test.