This will create a secure place on which you can fix the.
Fitting dry verge roof edge finishing.
Completely weather proof it requires no maintenance and is available in various attractive colours to complement your roof line and roof tiles.
How to fit a dry verge step 1.
Dry verge caps are usually made of plastic which in itself offers some distinct advantages.
Save money on marley eternit roofing products at roofinglines http bit ly 2cj9rqb.
Install the underlay if required and ensure all battens extend beyond the gable wall or bargeboard by 20 40mm.
Made from pvc u our dry verge roof finishing uses a simple clip fixing system of end caps for easy installation.
Finish the ridge with either a ridge end cap or a block end ridge.
The most obvious advantage is plastic s durability.
Position a verge piece against the top of the starter verge.
Plastic verge caps should last you at least 10 years and require a fraction if any of the maintenance associated with mortar.
A timber batten can then be installed running from the eave to the ridge to provide a base for the units to fix.
Dry verge roofing makes use of interlocking caps that fit over the edge of your roof tiles and offers an effective and more importantly durable alternative to wet verges.
Cut the verge extrusion approximately 150mm longer than the rafter.
The roofing felt and battens should be laid across the cavity and the battens finished flush with the outer wall or the outer edge of the bargeboard.
The water channel allows any rainwater to run directly into the rainwater gutter.
At the eaves the verge should be cut square flush to the lower tile.
Take a length of verge extrusion and plumb cut the upper end.
Dry verge caps installation cp tile protection.
Suitable on new build roofs or roofs where the existing verge is being renewed.
Fix the batten end clips to the end of each batten.
Fitting dry verge to old roof.
Fit the verge piece onto the starter verge so flush against it and there isn t any space between the 2 pieces.
If you are fitting your dry verge to an existing building you need to remove all of the old underclock and motor bedding before fixing.
Fit the eaves closure.